Applying systematic mine planning and operational coordination to ensure safe, efficient, and responsible open-pit mining.
At Leragold mine, we apply systematic mine planning principles to guide our pit design and development, excavation sequencing, equipment selection, and access and haul-road design. Our planning considers geological and geotechnical conditions, rock properties, ground stability, site topography, and drainage to support safe and efficient open-pit operations.
Pit layouts and mining sequences are designed to ensure safe equipment access, efficient material movement, and optimal resource utilisation. As exploration progresses, new geological information and operational data are incorporated into mine plans to refine designs and guide future development.
We develop integrated mine production schedules to coordinate excavation activities, equipment and personnel allocation, and ongoing exploration. Scheduling considers mining sequence, drilling and blasting requirements, equipment availability, loading and hauling capacity, maintenance, and material destinations.
Actual progress is monitored against planned targets to identify operational constraints and opportunities for improvement.
Where required, drilling and controlled blasting are used to fragment hard basalt rock, facilitating efficient excavation and loading. The fragmented material is loaded by excavators into haul trucks and transported to the designate destination according to its classification and the approved material-handling plan.
Our blast planning considers rock characteristics, fragmentation requirements, ground stability, vibration, flyrock, and the safety of personnel, equipment, and surrounding infrastructure.
We plan loading and hauling operations to ensure the correct handling and transportation of mined materials. Ore is transported to the processing plant or designated ore stockpile, waste rock to the approved waste dump, and stripped topsoil to a designated stockpile for potential rehabilitation use.
For these operations, excavators, haul trucks, and supporting equipment are selected and coordinated based on production requirements, equipment compatibility, haul distances, availability, maintenance needs, and operating costs. Our objective is to minimise delays, improve equipment utilisation, and maintain safe and efficient material movement.